Southland Integrated Transport Study Printer Friendly Page

Venture Southland, on behalf of Environment Southland, Invercargill City Council, Southland District Council, Gore District Council, Transit New Zealand, South Port and OnTrack, commissioned GHD Ltd to assess the current situation of Southland’s transport network and prepare an integrated regional transport infrastructure report for the region. The report was completed in December 2005.

The study aimed to examine the major transportation issues identified by stakeholders, the extent of challenges facing owners of the transportation infrastructure, and provide recommendations as to what actions need to be undertaken.

Part of the study involved a close evaluation of the current situation surrounding State Highway 94 (SH94), the Milford Road. The GHD study considered numerous transportation options proposed to mitigate some of the issues that were identified. At the time of the study’s completion, the Milford Dart Tunnel option was not available to be considered as the proposal became public after the submission date of the GHD report.

Venture Southland therefore commissioned GHD to prepare an addendum to the Southland Integrated Transport Study that specifically considers the Milford Dart proposal within the overall context of the Southland Integrated Transport Study and the Milford Road Report. The addendum was completed in June 2006.

[Note: the A3 size table referred to on page 99 (Section 12) of the main Southland Integrated Transport Study report is provided as a separate PDF - the second item in the menu to the right.]

View Reports and Appendices
pdficon_trans

Southland Integrated Transport Study(3.9MB)

pdficon_transMeeting the NZ Transport Strategy Objectives
pdficon_transAppendix C - Consultation Process
pdficon_transAppendix D - Roading Hierarchy(1.3MB)
pdficon_transAppendix E - Milford Report (2.2MB)
pdficon_transMilford Report Appendix A - Milford Map
pdficon_transMilford Report Appendix B - Milford Assessment
pdficon_transAppendix H - Southland District Council Projected Pavement Strengthening Histograms
pdficon_transAppendix I - Tiwai Bridge Report
pdficon_transAppendix K - Commodity Flow Diagrams (2.7MB)
pdficon_transAppendix L - Regional Funding
pdficon_transAppendix N - Annual Plans, District Plans, Long Term Council Community Plans
pdficon_transAppendix O - National Land Transport Programme 2005/06 Factsheet
pdficon_transAddendum - Milford Dart Tunnel
pdficon_transAddendum Appendix A - Assessment of Impacts
Note:Appendices other than those listed above are contained within the main report document
  